kitchen towel / Tissue production line

Short Description:


  • FOB PRICE: NEGOTIATION
  • MOQ: 1 SET
  • PORT: SHANGHAI
  • PAYMENT TERM: L/C, T/T
  • Product Detail

    Product Tags

    Glue lamination kitchen towel production line

    Style No.: KT-2800B

    Production Line Technology Data
    1.Production speed:100~180 m/min,
    2.Product diameter:≦130mm;
    3.Raw paper roll diameter: ≤2100mm;
    4.Raw paper roll width:≤2750mm;
    5.The distance between Perforated line: 100-150mm;
    6. Machine power: 7.5KW (380V 50HZ, 3 phase)
    7.Equipment over size (L×W×H):8.36*3.4*2.8M
    8. About 8 Tons
    9.Width of cutted toilet rolls: 90-240 mm
    10.Requirement of Raw Paper: Double plies style is 13-20 g/m² ; Single ply style is 20-40 g/m².

    Main Machine: Full Automatic Rolled Paper Cutting Machine
    1. Width of Jumbo rolls: 2800 mm (Depend on the length of jumbo rolls provided by customers);
    2. Diameter of jumbo rolls: φ100~φ120mm (Can be customized);
    3. Production speed: Cutting 80~100 times / minute×2 rolls / time;
    4. Machine power: 6.77KW(380V 50HZ)
    5. Overall size of Log saw cutting assembly(L*W*H): 7080×1750×1920MM
    6. Weight: About 2 tons

    Warranty of the equipment:
    One year. The spare parts will be replaced freely by the seller within one year (exclude wearing parts). The express cost of parts should be paid by the buyer. After one year, the seller will carry on the tracking of technology and quality. The seller will provide the buyer with wearing parts which has good quality and preferential price in a long time.

    Package:
    Wood Pallet and plastic film.

    Installation and training:
    the seller will send technician to the buyer’s factory to install and adjust the machine if the buyer ask for this. All the expenses of the technician including two-way air tickets, accommodation(food and room), transport (bus fee, etc), and salary(salary is USD85 / day for each technician) is to be paid by the buyer. The buyer should make ready for workshop, power, raw materials in advance, then the period for the installation and adjustment and training will be totally within about 20 working days.

     





  • Previous:
  • Next:

  • Send your message to us:

    INQUIRY NOW
    • * CAPTCHA: Please select the Tree

    Related Products

    INQUIRY NOW
    • * CAPTCHA: Please select the Star